Welcome to
Winnifred wind project
Winnifred
wind project
No. of Turbines:
22 turbines
Nominal Capacity:
136,4 MW
Collector system:
Underground network on private land
Substation location:
Section 28-11-8 W4
Interconnection:
Approximately 25 km east of the project area to the Bullshead substation.
The 138 KV transmission line routing to Bullshead has been approved by the AUC and will use the Township Road 120 corridor.
The 138 KV transmission line routing to Bullshead has been approved by the AUC and will use the Township Road 120 corridor.